


Alvor
Table lamp · Plaster base, linen shade
Cast and finished by hand once you ask for it, which takes six weeks; it's the piece people remember us by.
Six weeks, in order
- 01
WEEK 1
The mould
We pour your base the week you order, and write to tell you.
- 02
WEEK 2
Curing
The plaster rests for a week before anyone touches it.
- 03
WEEK 3
Sanding
A day's work by one person, by hand.
- 04
WEEK 4
Finish
Raw or limewashed, in the colour you chose.
- 05
WEEK 5
Wiring and shade
The shade is sewn now, so the linen matches the base.
- 06
WEEK 6
On its way
Wrapped, boxed and sent. We write again.
On the ledge

Shown beside No. 07, Marés, and No. 11, Setembro, leaning behind it.



Inside
The base is cast in a plaster mould and sanded back by hand, so the surface carries the maker's pass. E27 fitting, Portuguese plug, dimmable 2200 K bulb included. The cord is linen-wrapped in the shade's colour and leaves the base at the back. Six weeks is how long it takes to cast, cure, finish and wire one lamp; we'll write when it goes into the mould and when it comes out.
Six weeks, because it's cast once you ask for it.
Where it lives
Good company
Two pieces that sit well with Alvor.

No. 07
Marés
Linen in the same colours as the shade.

No. 12
Cal
Plaster too, but for the wall.

